Key takeaways from this call : results vs expectations, guidance, what analysts asked

  • Steve Ultimis 28%
  • Management 27%
  • Pete McGrath 19%
  • Stephen Zang 3%
  • Analysts 9%

Management

  • Steve Ultimis

    Management

    16 min

  • Pete McGrath

    Management

    11 min

  • Stephen Zang

    Management

    2 min

Transcribed automatically by Lician from the company's public webcast; it can contain errors and speaker names are best effort.

  1. Prepared remarks10:21
  2. Operator

    At this time, I would like to welcome everyone to Intuitive Machines third quarter 2026 earnings webcast. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question. and answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again. Thank you. I would now like to turn the call over to Stephen Zang.

  3. Stephen ZangManagement

    Good morning.

  4. Welcome to the Intuitive Machines third quarter 2026 earnings call. Chief Executive Officer Steve Altemus and Chief Financial Officer. Pete McGrath are leading the call today. Before we begin, please note that some of the information discussed during today's call will consist of forward-looking statements, setting forth our current expectations with respect to the future of our business, the economy, and other events. The company's actual results could differ materially from those indicated in any forward-looking statements due to many factors. These factors are described. under forward-looking statements in the company's earnings press release and the company's most recent 10-K and 10-Q filed with the SEC. We do not undertake any obligation to update forward-looking statements. We also expect to discuss certain financial measures and information that are non-GAAP measures as defined in the applicable SEC rules and regulations. Reconciliations to the company's GAAP measures are included in the earnings release filed on Form 8K. Finally, we posted an earnings call presentation to our website, which provides additional context on our operational and financial performance. You can find this presentation on our investor relations page at www.intuitivemachines.com slash investors. Now I'll turn the call over to Steve Ultimis.

  5. Steve UltimisManagement

    Good morning. Thank you for joining us. In the third quarter, we delivered record financial performance across the board with $269 million in revenue, representing 31% growth since last quarter, over $8 million in positive adjusted EBITDA, positive $33 million of free cash flow, and $1.9 billion ending backlog spanning civil, commercial. and national security customers. These results are an important proof point in our transformation from a company that advanced the state of lunar exploration into a next-generation space prime, developing and integrating the technology, infrastructure, and services that enable customers to achieve their differentiated missions across space. Recent strategic acquisition have added scaled satellite production. We have also expanded our mission operations, navigation, constellation management, communications, and ground segment capabilities, strengthening our integrated build, connect, and operate strategy. We are executing our vision as a global space infrastructure leader, a national asset that enables enduring commercial, civil, and national security solutions across every orbit and surface. To further support our vision, we are excited to welcome Dr. Chris Scalise to our board of directors, further strengthening our board with his extensive leadership and expertise across civil and national security space, including leadership roles as director of both Goddard Space Flight

  6. Center and the National Reconnaissance Office. Now, turning to our quarterly performance, during the third quarter, we definitized contracts for AMDT-3 and Hartford, both national security space missions based on the IM-300 satellite platform. We also definitized Eagle VisWare, an Earth observation mission under NASA's Earth Science Division. New Q3 awards that have not yet been definitized include the next phase of our orbital transfer vehicle for a national security customer, the Falcon Radar, a NASA science mission using our IM-300 platform, and transition of NASA's power and propulsion element contract to a NASA cost-plus contract for SR-1 Mars mission. Effective September 1st. Both Eagle VisWare and Falcon Radar, NASA science platforms, have applications beyond civil space markets, further reinforcing our diversified growth strategy. New bookings plus assumed black log from our Goonhilly and ComSat acquisition was over $450 million during quarter three, contributing to our record $1.9 billion. And backlog, demonstrating strong customer confidence and demand across multiple markets. While backlog provides a foundation for future revenue, the real measure of value is how effectively we convert contracted work into deliveries, revenue, and earnings. We are emphasizing production readiness, long lead material availability, and supplier preparedness, program schedules and capacity so that the

  7. We are seeing a lot of people in the future. Transition from award to revenue becomes more predictable. We are also making deliberate capital investments and capabilities such as the Altus satellite constellation that can support longer duration infrastructure services. Our strategy integrates three capabilities, building spacecraft and infrastructure, connecting them through communications and navigation networks, works. and operating them throughout their mission lives. Our build capabilities deliver space vehicles to national security space, civil space, and commercial customers. Earlier this year, we secured significant awards for new lunar delivery missions, commercial geostationary communication satellites, and additional space development agency spacecraft. For the commercial sector and our IM-1300 series I agree. satellite offering, we delivered the Sirius XM-11 satellite to the customer. This geostationary satellite is fully operational in space now. Our commercial pipeline remains robust. In addition to the six commercial IM-1300 spacecraft in either early development or production, we see multiple new bids in the pipeline, positioning us for continued growth in the commercial sector. Our expanding work in national security space, specifically the Space Development Agency's tracking architecture, AMDT-3, Hartford, and Orbital Transfer Vehicle, provides evidence that we've matured as a company and have the ability to manage the development of complex systems with demanding requirements.

  8. We believe strategic investments in production capacity, long-league materials, supplier readiness, and workforce capabilities will increase awards and shorten the interval from award to production and delivery. This aligns with emerging requirements we've seen from our customers. In-space compute applications remain early-stage opportunities. We are aligning investment with funded demand, technical maturity, and credible economics. Our experience may- manufacturing high-power commercial spacecraft, the IM-1300 platform, gives us a foundation in power generation and distribution, system integration, and thermal management. NASA's SR-1 program extends that experience into advanced power and propulsion architectures relevant to sustained civil and national security operations. The SR-1 effort is an opportunity to apply our high-powered spacecraft and the SR-1 effort is an opportunity to apply our high-powered spacecraft. manufacturing discipline to the integration challenges of power-intensive space systems. With over 25 satellites producing 20 kilowatts plus of power in orbit and our work to scale the SR-1 over 60 kilowatts, we believe we are well positioned at evaluating how these capabilities could also support high-power compute platforms in space. including edge computing and orbital data center concepts, where electrical power, thermal management, and reliable operations are fundamental design constraints.

  9. Our lunar business remains a strategic differentiator and an important bridge from individual missions to enduring infrastructure. NASA's evolving plans for sustained activity on and around the moon, including its moon-based efforts, point toward . . . requirements that extend beyond individual payload deliveries. Under NASA's Commercial Lunar Payload Service's 10-year contract, IM secured six mission awards with two completed missions to date and several outstanding bids with pending awards, establishing a multi-mission production portfolio extending throughout the remainder of the decade. Future lunar activities will require . . . Heavier transportation, communications, navigation, mapping, power, and continuous mission support. As part of NASA's moon-based initiative, they have extended the Eclipse operation model, known as CLIPS-2, for the next 10 to 15 years at a total value of $10 to $15 billion. As an awardee, we're excited to participate in this next evolution of CLIPS-2 with expanding . . . limited tasking opportunities to meet NASA's needs at the moon, Mars, asteroids, and beyond. The broader scope of CLIPS-2 builds on our extensive leadership in space infrastructure and aligns with investments we're already making while helping to accelerate NASA's moon base and shape new opportunities for customers. On our existing lunar contracts, we continue to focus on executing milestones. In late October . . . .

  10. We successfully fired our LOX methane engine on a fully integrated IM3 lander. We are on track to complete final end-to-end testing in the first quarter to support a planned launch in the March-April timeframe. The IM3 launch is also expected to deploy our first Altus Lunar Communications Relay Satellite, representing a significant step toward integrating our lunar transportation and communications infrastructure. In terms of launch, we have commercial Falcon 9 boosters purchased for our missions through 2028 and believe we have access to government purchase boosters through 2030. This provides continuity as we manage the transition and launch providers and work with alternative providers while they ramp up capabilities for our mission requirements beyond 2030.

  11. Connecting and operating the near space network extends our participation from delivering assets to enabling communications and navigation services. To support our NS-NS contract, we are developing the ALTIS architecture for sislunar communications and navigation. We are accelerating ALTIS II through ALTIS V to deploy the remaining satellites together in 2028 aboard a NASA-provided Falcon 9 booster, recently confirmed by NASA's moon-based leadership. We are actively engaged with the Pentagon sislunar coordination office and responding to Space Force RFIs calling for space domain awareness, communications, positioning, navigation, and timing in ground communications out to sislunar space in alignment with our investment in NASA near space network. We have also expanded ground infrastructure and deep space communications capabilities, integrating ground stations, satellite communications expertise, flight dynamics, and navigation into a broader network architecture. We closed on the Gunnhilly Earth Station ComSat acquisition on August 3rd. Gunnhilly's strategic UK location will expand visibility across major earth viewing arcs, increasing contact opportunities for lunar and deep space missions. With deep expertise in antenna, planning, scheduling, and station maintenance, Gunnhilly's ground station assets and competencies strengthen our ability to deliver end-to-end mission support. Since the acquisition, Gunnhilly has demonstrated their ability to support space domain awareness between dishes at their Cornwall, England site.

  12. We continue to expand our ground network with the recent addition of a new dish partner and completion of an upgrade to their 32-meter dish at Roaring Creek, Pennsylvania. This dish upgrade enables S, X, and KA band communications from Earth to the moon and beyond, increasing our uplink and downlink capabilities and expanding our capabilities in telemetry, acquisition, tracking, and command relay. We recently demonstrated performance of the ground station with NASA's Lunar Reconnaissance Orbiter and James Webb Space Telescope. We are leveraging the same modifications across existing and future partners to complete our ground network that will support MSNS. As our data relay constellation and ground capabilities are deployed and integrated, we see the potential for longer duration communications navigation. Data and mission operations services. Reliable connectivity will be foundational to sustained activity in syslunar space. Now, OPERATE. OPERATE extends customer relationships beyond spacecraft delivery into sustained mission support. We have completed the build out of our primary satellite constellation mission operations center at our headquarters located in Houston. We are in the process of integrating Gunhilly's mission operations center as well as building out a backup mission control center at our Maryland facility. With completion of our primary first mission operations center, we have begun training our satellite operators in advance of the ALTIS-1 launch. This operational capability creates opportunities for longer duration operational revenue. As more spacecraft and communications

  13. we are going to be able to do that. Thank you. Networks and infrastructure systems are deployed. Customers will increasingly require dependable mission operations, flight dynamics, navigation, data management, and ongoing technical support. I'd like to take a moment to provide comments on the recent midterm election. Looking forward, federal budgets and policy direction may likely evolve. We've been building a diversified portfolio across civil, commercial, and national security space. Each market represents about one-third of our business today. We believe the convergence between civil and national security space associated with deploying and operating space infrastructure will continue and will offer additional opportunities that we are well positioned for. Creating a cislunar economy is also well aligned with current and future political economic development. We believe the United States returning to the moon has and will continue to have bipartisan support as we continue the space race with China. It's critical for the country to develop a sustainable lunar economy and lead the world in space exploration. Returning to the moon is clearly a strategic importance to the United States. Collectively, the industry must continue to produce capabilities that enable expansion. of the lunar economy. For our part, we plan to accomplish this through a steady cadence of missions, deploying critical infrastructure that supports robotic and human exploration. We will align capital and program commitments with funded customer priorities while pursuing opportunities for shared infrastructure and international cooperation where appropriate. As we look to turn the corner into 2020.

  14. Our emphasis will be to continue to scale execution and accelerate growth. We expect to convert contracted backlog into revenue through repeatable production, operational excellence, and reliable customer delivery. We're not simply delivering missions. We are building, connecting, and operating the infrastructure needed for sustained activity in space and working to translate that strategy into measurable performance for our customers. Customers and shareholders. With that, I'll turn the call over to Pete McGrath for a more detailed review of our third quarter financial performance. Thank you.

  15. Pete McGrathManagement

    Thank you, Steve, and good morning, everyone. As Steve discussed, Intuita Machines continues to make meaningful progress in scaling our business across commercial, civil, and national security markets. Our third quarter results demonstrate that progress. With revenue increasing 31% over the last quarter, continued improvement in gross profit, and positive adjusted EBITDA. Our focus remains on translating this growth into more predictable operating performance, improved profitability, and ultimately stronger cash generation. Let me walk through our third quarter results. Third quarter revenue was $269 million, bringing year-to-date revenue to $662 million. Our growth is reflected in execution across satellite production, lunar delivery, lunar data services, and ground communication networks, which includes revenue from contracts awarded late in the second quarter and during the third quarter. Recall, last quarter, we made investments in production readiness, long-lead materials, and manufacturing capacity. These investments position us to respond more quickly and deliver our customers timeliness. which enabled new program awards in Q2 and Q3. We started recognizing the revenue associated with these contracts in the third quarter. Year-to-date revenue was approximately 39% civil, 34% commercial, and 27% defense, reflecting the diversification of our customer base. Gross profit increased significantly to $69 million in the quarter, representing a gross margin of 26%.

  16. Compared to $6 million of gross profit and 11% of gross margin in the prior year quarter.

  17. The improvement reflects the increased contribution from our satellite production business, higher volume, and approximately $19 million related to net favorable one-time program adjustments, which also includes EAC and other cost adjustments in the quarter. Our focus remains on making that performance more consistent through dis- discipline program execution, greater production efficiency, and improved utilization of our manufacturing infrastructure. SG&A expense was $83 million in the quarter and included several non-recurring items. Share-based compensation, non-recurring legal expenses, and acquisition-related transaction integration costs totaled $30 million for the quarter, which are backed out of adjusted EBITDA. SG&A expense also included in- $9.5 million reserve related to the HughesNet bankruptcy, which was not backed out of adjusted EBITDA. We believe our current accrual sufficiently covers our receivables risk tied to their bankruptcy. In October, we concluded our transition services agreement with Vantor after successfully completing the transition of all systems and services following the Lenteris acquisition. Depreciation and amortization total- $13 million. Research and development expense was $7 million in a quarter, driven by investments in landing sensors, high-powered processing satellites, and larger cargo-class landers ahead of the CLIPS II task orders. We reported an operating loss of $34 million in a quarter, which included the SGA charges discussed above, as well as the contracted adjustments reflecting gross profit.

  18. Adjusted EBITDA was positive $8 million, compared with negative $13 million in the prior year quarter, and negative $14 million in the second quarter. We ended the quarter with $464 million in cash, compared with $367 million at the end of Q2, resulting in a sequential cash balance increase of $97 million. This increase includes cash outflows of $18 million for acquisition of businesses, and $9 million for repayment of loans.

  19. This aligns with the acquisition price of 37 million British pounds. Note that the remaining value was paid in stock. During the quarter, we received approximately $97 million of net proceeds from our at-the-market program. Cumulative gross proceeds through Q3 were approximately $337 million at a volume-weighted average. Price of $23.90 per share. Our liquidity supports current operations and planned infrastructure investments while preserving strategic flexibility. Operating activities generated $66 million of cash in the third quarter, a record for the company, compared with $60 million use of cash in the second quarter. The improvement reflected stronger collections, cash associated with new contract wins in Q2 and Q3, as well as... the absence of unfavorable working capital timing we discussed last quarter. Capital expenditures for $33 million in the quarter are driven primarily by the acceleration of our NSNS lunar constellation. As Steve mentioned, we are accelerating investment in the Altus constellation and associated ground infrastructure to support an Altus 2 through 5 launch in 2028 with a launch service provided by NASA. Our capital investments... to remain focused on capabilities that support near-term program execution and long-term infrastructure opportunities. These investments are intended to support the transition from individual mission deliveries toward longer duration communications, navigation, and operational services. We expect capital expenditures to remain elevated as we complete these infrastructure investments. We will continue to evaluate spending against customer requirements, development schedules, and...

  20. expected economic returns. Free cash flow, defined as operating cash flow-less capital expenditures, was $33 million in the quarter, a company record. Our priorities are to improve cash generation for operations while maintaining the timing and schedule of our CapEx satellite and infrastructure investments. Turning to backlog. We ended the third quarter with $1.9 billion of contracted backlog. Reflecting continued demand across our commercial, civil, and national security markets. New bookings plus assumed backlog from Goonhilly totaled approximately $450 million. Bookings included 18 AMDT-3 in support of Golden Dome satellites for L3Harris, two IM300 satellites for Hartford, and NASA's Eagle-Vismur Earth Science spacecraft. Pending backlog also refers to the reflects the removal of the remaining PPE scope and the addition of the first phase of the cost plus SR-1 contract. We expect the full scope of SR-1 to be booked in the fourth quarter. Ending backlog was approximately 32% civil, 43% commercial, and 25% defense. Based on current program schedules, we expect approximately 13 to 15% of our September 30 backlog to convert into revenue during the fourth quarter of 2026, approximately 40 to 45% during 2027 and the remaining thereafter. As of November 5th, our total shares outstanding are $232 million, with 177 million shares of Class A and 55 million shares of Class C. Moving on to guidance. We are refining our full year 2026 revenue.

  21. Outlook to a range of $920 to $950 million, reflecting the timing of certain anticipated contract modifications and awards. We are maintaining our guidance for positive adjusted EBITDA for the full year as we continue to focus on improving underlying operating performance as the business scales. As always, we will remain focused on program execution, cost discipline, and converting backlog into revenue and cash. We continue to invest in our long-term infrastructure strategy. Looking at 2027, our diversified backlog, expanded manufacturing portfolio, and communications infrastructure will provide a foundation for continued growth. Our expected backlog conversion profile provides visibility into a meaningful portion of next year's potential revenue. We expect to provide our 2027 financial outlook with our fourth quarter results. Our priorities next year are to increase production throughput, improve cost efficiency, and expand long duration services. Our long-term financial objective remains straightforward. Convert backlog into revenue, revenue into profitable earnings, and earnings into cash flow. With that operator, we are ready for questions. I would like to remind everyone in order to ask a question, press star, then the number.

  22. Q&A37:45
  23. Operator

    One on your telephone keypad. And your first question comes from a line of John Siegman with Stiefel. Please go ahead.

  24. Hey, good morning.

  25. Thanks for taking my question.

  26. A lot of good news in the quarter.

  27. Thanks, John.

  28. As we start thinking about 27, the backlog gives some great visibility, as you mentioned. 40% to 45% that you referenced is at least 70%. 750 million in 27 already sitting there. So that's, by our numbers, 35% more dollars compared to where you were post-Lenteris last year. I know your guidance will be later, but just the framing of that, does that make sense? And then when you think about your balance, 3N markets, how would you force rank their growth contributors potentially in 27? Thank you.

  29. Yeah. I would say it does make sense in terms of the amount of backlog that we see pushing forward into 27. We believe we're in that range that was provided. I think you were looking at more of the lower midpoint of that range, but we've seen significant growth on the Lantara side. They've done exceptionally well with all the captures that we've been working with them. As I know, we've also pursued new things that... neither party was going to pursue that we see as opportunities moving into awards next year as well. So it does align well, and I do see them continuing to look well. Again, we'll provide the guidance when we get to the fourth quarter earnings. And then it slipped on just on cash, because that was fantastic. Can you call out any advances or miles? Stone timing that might have kind of boosted Q3 and just what level of CapEx should we be thinking about for 27, just as we project forward? Thank you. Sure. And, you know, we did have some turn on with some of the contract awards. We get some early cash payments, funds, and we did some investment, as we mentioned, in inventory. So that helped cover some of those expenses we already have. Which I think is why you saw the cash flow up in the second quarter. So it's a little bit of the timing of the working capital, I think, what we talked about. But we did also see improvement, I think, across the board. With regards to CapEx, I think we're at, or a little bit, maybe a little bit higher as we move into the fourth quarter and the first quarter next year, as we complete out the Altus 2 through 5 satellites.

  30. We're procuring a lot of that hardware right now, so that's going to roll through. the system as we prep for launch in 28. Thank you. Good luck with the rest of the year. Thank you.

  31. Operator

    Your next question comes from the line of Andres Shepard with Cantor Fitzgerald. Please go ahead.

  32. Question · Cantor Fitzgerald

    Hi, everyone. This is Peter on for Andres. Congrats on the quarter and thank you for taking our questions. And congratulations on being awarded as part of the Eclipse 2 contract. So maybe to start off, are you able to share a bit more granularity about this opportunity? What's the timeline for these missions and how you view Lunar Precision to capitalize on them? Thank you.

  33. Management

    Yeah, thanks. Appreciate your question. CLIPS 2.0 is a critical part of NASA's moon-based program or initiative. It's currently set as an IDIQ, which is indefinite delivery, indefinite quantity, with eight vendors that were chosen to participate over a 10-year period with an option for five additional years at $10 billion for the first base period and $5 billion for the balance of the option period. So primarily what you look for is an increase in transportation, orbiters, and orbiters around the moon. And specifically in terms of transportation, they're looking for heavier cargo landers to deliver much more mass to the surface of the moon, as well as much more complex payloads, many more complex payloads, higher fidelity payloads, that can give us the science and the infrastructure necessary to put humans on the moon in the future. So that's kind of the focus of it. And we're looking forward to the next 10 years of establishing the lunar economy with this contract. to some dad is We have two soon to be three proposals on CLIPS 1 still that are submitted. We may see one more under CLIPS 1. And then they'll transition to the CLIPS 2 pursuits for RFTPs after that. Great. And maybe as a follow-up, looking ahead to IM3, can you remind us maybe some of the milestones that are left ahead of launch and how is this lander separate from the previous ones? We have... It's a consistent production line for the NOVA-C lander. So IM3, Mission 3, is a NOVA-C. It takes about 130 kilograms of payload to the surface of the moon. It is a liquid oxygen, liquid methane lander like our previous others. We've been through the hot fire with the integrated vehicle where we fired the engine on the vehicle and checked out the propulsion system in avionics. We'll now do the end-to-end function.

  34. Management

    Testing into the new year, finish our landing sensor flight test on an aircraft, and be ready to launch towards the end of the first quarter, maybe April of 2027. Got it. Very helpful. We'll pass it on. Thanks.

  35. Operator

    Your next question comes from the line of Edison U with Deutsche Bank. Please go ahead.

  36. Thanks a lot for taking our questions. First, I want to ask about the midterm, long-term launch situation. I mean, you come at it from both ways, right, both on the lunar side and also on the satellite side. Do you worry at all about securing launch capacity, you know, call it after 2029, or do you have pretty good confidence that Starship will be available?

  37. So the launch capacity story is not yet complete in terms of fully written in terms of when we're going to see retirement of the Falcon 9 and when the new entrants will have their launch capability ready. We are confident, though, that we have purchased boosters through 2028, and we have recently... Government has stepped up to use the Vader contract in NASA to purchase boosters from the government and supply those for some of the tasks that we have planned in 2028 through 30. So that's an important stopgap. While the new entrants bring their capability online and we transition to the other varying boosters that are out there that have the capability to throw to translunary. As well as for our LEO constellation and our geosatellites. And so we're watching it closely. We have a plan and we're moving forward. And so far we have things covered and we'll watch how things develop.

  38. Understood. And a follow up, another long term, probably even longer term question. I think in the past you talked about overall data centers and I think you mentioned that preparing remarks on some things. Well, we've seen some, some movement in supply chain for, for another company. And so I'm curious, you know, how are your discussions with customers on whether it's orbital compute, edge compute, how those discussions coming along? And could we expect, you know, something more material perhaps next year?

  39. We've been looking at high power satellites and and, uh, you know, how you manage high powered satellites thermally on orbit, uh, for the application of edge compute and orbit data centers all year long. We've been looking at that and we're currently in a design study to look at how we can increase production to produce larger quantities of satellites, um, production satellites for orbital data centers. So, uh, we're working along those lines. As soon as the demand picks up, we'll be in a good position to leverage our, uh, high power. Satellite skills and capabilities to support that emerging market. Thank you. Thanks, Edison. Your next question comes from Griffin Boss with B-Riley Securities. Please go ahead. Hi. Good morning, everyone. Thanks for taking my questions. Um, so I just want to jump back first to, to Eclipse 2.0. Um, I, uh, has any.

  40. Question · B. Riley Securities

    Has your view changed at all on when you expect task orders to flow through? I think at quarters past, you've discussed the expectation for early 2027. Pete, I don't know if you just said that you expect those task orders to flow through after these next Eclipse 1.0 task orders come in or not, but if you could just give some clarity on, on any change in your expectation, that'd be helpful. Uh, yeah, no change in the expectation. We have, uh, three, uh, three bids on clips one that, um, have been submitted, um, already that we'll wait for, um, award, uh, that'll close out clips one. And then we expect clips two to pick up in 2027. Um, and you'll see, like I said, uh, larger cargo landers as part of that, maybe block buys of, uh, several missions at a time and, uh, also orbiters and transfer vehicles. We'll all. We'll still be part of, uh, clips 2.0. So we see that on ramping with the uptick in moon base in 2027. Okay, great. Thank you, Steve. Appreciate that. And then just a follow up. I wanted to talk about a couple opportunities that I don't believe you mentioned today, but you've talked about in the past, specifically the, the Andromeda, RGXX, IEIQ, and then NASA's TDRS opportunity. So do you have any, any, any updates on, on where those stand? Have we started? We've been seeing task orders flow through for RGXX and any updated color on, on where TDRS stands. It'd be great. Thanks.

  41. Yeah. The RGXX proposals were due and have been submitted, I believe last week. So we'll wait to see when that, those awards will be made. It's with the government's hand. It's in the government's hands now. And then with respect to TDRS, only the first part of TDRS was. It was put out for bid, and that's the KU band portion of recovery. That was the most dire need for upgrades in TDRS. We do expect here in the near future the S-band portion of TDRS tracking data relay to come out for bid, and we'll participate in that also. Excellent. Cool.

  42. Thanks for the color, Steve.

  43. Appreciate it.

  44. Management

    Thanks, Griffin.

  45. Operator

    Your next question comes from the line of Tsuji De Silva with Roth Capital. Please go ahead.

  46. Question · Roth Capital

    Hi, Steve.

  47. Management

    Hi, Pete.

  48. Question · Roth Capital

    Congratulations on all the progress here. You talked about the Altus 2 to 5 lunar satellites, and can you say, was the timing of those being pulled in? Is it still one per lunar mission, or are they going to be multiple, and is there a reason for any acceleration if that's what's happening?

  49. Management

    Communications, navigation. PNT, all the data relay work, is critical infrastructure for the future of opening up the lunar economy, and the faster we get that infrastructure up and around the moon, the more capable the systems will be to deliver additional payloads and infrastructure and crew to the moon. So we are going to put Altus I up on mission three, is our plan, which is the most important. March, April timeframe. And then we have been selected for a booster by NASA's Vader contract to put all four birds in 2028, the balance Altus 2 through 5 on a SpaceX Falcon 9, and fly that out to the moon. So we'll have all five satellites up in the 2028 timeframe. Okay, that's great. And then for the lunar missions for Eclipse 2, can you talk about if those intercept, they will, I imagine, intercept your larger landers, I guess previously called NOVA-D, and maybe what would be the size of the contracts on average in Eclipse 2 versus Eclipse 1, just to get a sense of how big, how much those scale up? Yeah, I would expect with the larger cargo landers, you know, they're looking for... landers eventually in the two to five metric ton payload delivery. You know, we're delivering today 130 kilograms of payloads to the surface, and those are running about $150 million per task order. So when you increase the size to two to five metric tons, you can expect a significant uptick in the price of those landers. I don't really have an estimate on the size of the task orders yet. We'll have to wait.

  50. Management

    and see how they're structured and, you know, how we can respond to those. But I expect with the larger landers, NOVA-D and NOVA-M, we'll put heavier cargo up and those will be at an increased price. Okay.

  51. Management

    Thanks, Steve.

  52. Management

    Thanks, everybody.

  53. Management

    Thanks, Suji.

  54. Operator

    Your next question comes from the line of Ronald Epstein with Bank of America. Please go ahead.

  55. Question · BofA Securities

    Good morning.

  56. This is Andrew on for Ron.

  57. Thanks for taking my question.

  58. I guess a bigger picture one on Clips 2.

  59. Management

    Good morning, Steve.

  60. Question · BofA Securities

    So with NASA having expanded scope, particularly covering the procurement of launch ride shares, does that mean there could be dedicated missions for Clips 2 vendors procured by NASA, or is launch access protected in a way? For vendors, given the risks of tightening capacity and rising costs in the launch ecosystem?

  61. Management

    Yeah, there's definitely a possibility of that. The way that Clips 2 is structured, they can buy a commercial service where, like Clips 1, the vendor or intuitive machines would provide the entire end-to-end service to bring scientific payloads to the moon. and return data back to NASA, the customer. In Clips 2.0, we can have that model and use that for their own purposes and aggregate their own payloads and provide a booster and fly it. So they might want to fly a lander on their own. That's another option. And then there's a hybrid where they say, hey, you do the lander and deliver it. We'll supply the booster for the Vader contract and give you access to that. Their intention is to provide a number of transportation opportunities to the surface of the moon. And then they'll decide which payloads are ready, when they're going to fly, and which ones will go on which lander at what time. And they're really trying to make an increased cadence traffic model where they have many more payloads available to fly to the moon, and they can pick and choose based on those payload availabilities. Gotcha. I appreciate that color. And I guess just a follow up here. And I know you touched on it earlier, but you know, obviously, the contract covers 10 years, but and task orders are expected to start coming in in 2027. But is there any sort of urgency to I guess, you know, move quickly at NASA, you think, given Falcon 9 slowing down?

  62. Management

    Well, I think independent of SpaceX's situation with their potential retirement of Falcon 9, NASA has, under Jared Isaacman, created a sense of urgency in terms of opening up the lunar economy and getting many shots on goal or a higher cadence of missions. Under Clips 1. For example, there have been let 22 mission task orders on Clips 1. Half of those have come since March of this year. So there has been an uptick, and we expect that uptick in pace and cadence and that urgency to continue, if not even accelerate, through 27, 28, and 29, et cetera.

  63. Operator

    Your next question comes from the line of Austin Moeller with Canaccord Genuity. Please go ahead.

  64. Question · Canaccord Genuity

  65. Good morning.

  66. Steve and Pete. So just my first question here. So yesterday on the Senate floor, Senator John Kennedy was talking about a $200 billion reconciliation package. Is there specific funding that you expect to see in there for Golden Dome or military space that is important for AMDT3 or other programs you're involved on?

  67. Management

    I'm not sure yet, Austin, what that is. A reconciliation request or call for would include. From the size of it, it appears that that Golden Dome would be included. Right now, we think the track layer and the AMDT3 layer that we are developing is solid and potted independent of any reconciliation funding upper to defense for Golden Dome. So, those... Track 3 and AMDT3 are moving forward in earnest, and we're developing satellites for it now under funding with L3 Paris. The future of Golden Dome, I'm not sure. I'm not certain what the midterm election will do to that process and whether it'll slow that activity down or speed it up. Okay. And once you deploy... The first Alta satellite in April, what do you expect or ballpark for the commissioning time looking like before that satellite can start to generate revenue with NASA and other customers? Yeah, we expect that we've been talking about operational service task orders already for the Constellation and trying to get those potted and under contract. But we think the commissioning phase is 60 to 90. 90 days post-launch to get the satellite in position, checked out, and ready for operations. Excellent.

  68. Management

    Thanks for the caller.

  69. Management

    I'll pass it back.

  70. Management

    Thanks, Austin.

  71. Operator

    Your next question comes from Michael Leshock with KeyBank Capital Markets. Please go ahead.

  72. Question · KeyBanc Capital Markets

    Hey, good morning.

  73. I'm NSNS with Altus One going up in a few months. Should we expect meaningful operational revenue in 2027? Only one satellite, or does that not come until the other four are launched? And then, secondly, you've talked about kind of a pay-by-the-minute kind of structure for that service over time. Is there any way to frame what the long-term annual revenue is for that service once it's fully online?

  74. Management

    Your first part of the question, Altus One, we are planning and in discussions for operational service. revenue from that satellite. There's pay-by-the-minute opportunities for data relay. There's broadcast services for P&T. And then there's other payloads that we have flying on that satellite that will generate their own operational service revenue. All that has not yet been quantified at the magnitude of that, but then when you put the other four satellites up in a constellation, you can expect a stepwise increase in operational service revenue as the P&T broadcast service becomes completed and you have much more availability on the constellation with much more alternative payload swap, we call it, size, weight, and power, and providing that service revenue also. So we do see a step up as the satellite constellation gets more capable. Great. And then just taking a step back on the supply chain, what are you seeing as like the biggest bottlenecks across the supply chain today? And, you know, any way to frame what parts of the business are more acutely impacted by that?

  75. Management

    We have a robust supply chain, especially with the acquisition of Lanteris. They've got a very sophisticated supply chain that's globally connected. We do see... That there is a challenge in space-based radios. Those are very long-lead items. Also, the landing sensors, they're long-lead items. And so we watch that very carefully. We pre-purchase inventory in a lot of cases to make sure that that inventory, that those things that are long-lead, like radios and sensors, can meet the scale. that the customer is looking for. And so in some cases, we'll make an investment in inventory to make sure we can deliver the satellite in the time frame they're looking for.

  76. Management

    Great.

  77. Management

    Thanks so much.

  78. Operator

    Your next question comes from the line of Marnie Lifard with Macquarie Group. Please go ahead.

  79. Question · Macquarie

    Marnie LifardAnalyst · Macquarie

    Good morning.

  80. Thanks for taking my question.

  81. I just kind of appreciate where you've called out some nuances driving the free cash flow result in the quarter regarding working capital and timing. Maybe just to kind of zone in on some of the other drivers of that, other quantification of that in the balance sheet. So the step up in payables and how we think about that moving forward.

  82. Management

    Sure. So I think the significant movers in the cash flow statement this time, you're going to see the purchase of Gunhilly roll through in the quarter between the cash payment. And by the way, I think we say in the statement, there's a cash payment and a debt payoff as part of the acquisition. Basically, the payment of cash covered also a debt payment back to the major shareholder. And that's why you saw that reference that way. But that total value of the Goon-Hilly payment came out of cash this quarter. The CapEx, I think it was $31 million of CapEx. And so those were really the two main drivers on the outflow other than COGS. And then from that, we had an inflow of about 69. I think it was. I get the numbers a little off. But we had an inflow from the ATM. But I think you saw most of it washed out. So it's all about neutral with the ATM inflows. Okay. And another question I have is just regarding, I guess, you've got the year-to-date revenues, the full-year revenue guide. You've now got two acquisitions that have closed and settled this year and contributing. Is there any seasonality to call out with that? Because if you apply the year-to-date revenues against the bottom end? The full-year revenue guide, it implies a sequential decline Q&Q. So, yeah, just to maybe kind of set the scene in how we should be thinking about business, appreciate you've made similar comments earlier in the call.

  83. Management

    I would say if you start back at Q1, I just want to give you some backdrop on it. If you start at Q1, we really only saw half a month of January of Lantaris in our revenues. And so we ran. We ran a little under $200 million in the first quarter. We saw the full benefit of Lantaris in the second quarter, which pushed us a little over $200 million. What you saw in the third quarter is really the wins that occurred in the second and third quarter and the step up in a lot of the revenue from that, which is really helping show the new growth part of the business and how we're growing. I think you may see something more leveled slightly up in the fourth quarter. And that's why we're showing the range that we're giving in terms of guidance. And then as you move up, and I'll give guidance for 27 next quarter, but when you look at that, we are probably getting to a new level of revenue going forward versus seeing a decline over time. That's understood. I'll jump back in the queue.

  84. Question · Macquarie

    Marnie LifardAnalyst · Macquarie

    Thanks for answering my questions.

  85. Operator

    Your next question comes from the line of Jeff Van Rie.

  86. with Craig Hellen. Please go ahead.

  87. Question

    ?
    Jeff Van RieAnalyst

    Hey, good morning, Steve.

  88. Pete McGrathManagement

    Good morning, Pete.

  89. This is Daniel on for Jeff. Maybe just on NSN. Yeah, good morning. On NSN, with the first satellite going up on IM3 and then the other four all going up at the same time in 2028, maybe if you want to just talk through that launch change to put all those together instead of on Clips launches and sort of the architecture decisions and what led to that.

  90. Yeah, the decision I made to aggregate them on the mission in 2028 was really to put the full operational capability of the constellation in place to meet the traffic needs that were called out via moon base in 2028. A lot of missions going to the moon in 2028. So we wanted to make sure that that constellation, that infrastructure was in place. In the original plan, we... We're putting up one satellite on mission three, two satellites on mission four, and two satellites on a mission that was in 2029. So we wouldn't have the full constellation up until late 29. And by aggregating all satellites on a dedicated booster in 2028, we can have the full constellation up by roughly mid 2028. And it really was just this increase in pace that NASA called. That we made that decision. Okay, that's helpful. And then, Pete, just one modeling one. On the EACs, the positive adjustments to the quarter, what programs or generally, if you can call out sort of what that was about or in relation to?

  91. We had some favorable performance on a couple of satellite programs. And then, you know, as we continue to move out a couple of EAC adjustments that were... It's a relatively minor on some of the landers.

  92. Thanks, Steve.

  93. Question

    ?
    Jeff Van RieAnalyst

    Thanks, Pete.

  94. Management

    Appreciate it, Daniel.

  95. Operator

    Your next question comes from Greg Pendy with Clue Street. Please go ahead.

  96. Question · Clue Street

    C
    Greg PendyAnalyst · Clue Street

    Hey, guys.

  97. Thanks for taking my question.

  98. Just on the land terror side, I guess post-election, is there anything in the life sciences that was cut that may resurface? And then secondarily... It seems like there's a lot of satellites and connectivity, whether they be broadband or directed device, that are looking for a launch partner. So I'm just curious, does the land terrorists have any customer exposure to maybe, you know, customers that might be struggling given the launch bottleneck? Thanks.

  99. Management

    Well, I would say science missions, what you've seen is we haven't seen the cuts in science missions. We've gotten three awards in science here recently. One is the edge program. One is, and we mentioned two, the Eagle VisWare and the Falcon Radar. So three high profile science missions for us is really, really a nice set of awards. We, and, you know, science is still a critical part of opening up the lunar economy. So we'll see more science payloads come available here in the near future. NASA has looked to revamp the science bid process to where it makes it easier to propose against their requirements or their RFPs and faster selection. So we're looking forward to that. Uh, in terms. of, uh, launch access, uh, we haven't seen a bottleneck on the Lanterra side with any of the, uh, track layers or any of the commercial geo birds. Um, and our launch, uh, uh, I'm sorry, our lunar business, our launches of, uh, lunar missions have not been restricted based on, uh, a decrease in launch cadence, uh, at this time. And we have a plan to, uh, keep us moving through. 30. That's very helpful. Thanks.

  100. Operator

    There are no further questions at this time. I will now turn it back over to Steve Ultimis for closing remarks. Thank you. And thank you everyone for your questions today. You know, as you heard, Q3 was an exceptional quarter for the company, not only across the board financially, but also operationally as we completed the transition and integration of our acquisitions.

  101. Steve UltimisManagement

    without missing a beat for our customers. And we look forward to continuing this momentum into 2027. Thank you.

  102. Operator

    Ladies and gentlemen, that concludes today's webcast.

  103. Thank you all for joining. You may now disconnect.

Replay